Your Position:Home » Product Show » HZS simple concrete mixing plant
HZS25 modular concrete mixing station configuration table
NO | Configuration | Quantity | Price | Total | Remarks |
1 | Mixer JS500 | 1 | Date of delivery: delivery and commissioning within 15 days since the date of signing the contract. The unloading height is 2.7m or 3.8m with maintenance platform, the ladder-type loading and the pneumatic unloading, the platform is selected with the same base plate designing scheme. | ||
2 | Aggregate batching machine PLD800 | 1 | Adopting PLD800 3-hopper E-metering aggregate batching machine, metering by belt weigher, and adjusting the difference automatically | ||
3 | Powder metering system | 1 | Using electronic scales cumulative measurement of cement and fly ash from the centralized console centrally controlled by a screw conveyor transport to the host. Butterfly valve discharge. | ||
4 | Water weighing system | 1 | Optional | Electronics measurement, automatic adjustment gap, discharge valve | |
5 | Additive metering system | 1 | Optional | Electronics measurement, automatic adjustment gap, discharge valve, the tank containing additives and admixtures pump. | |
6 | Ash warehouse SYN100t | 1 | Optional | Using 100 tons of fly ash storage, built-dust, anti-spill top device, comprising blowing broken arch, lack of full material alarm. | |
7 | Cement silo SYN100t | 1 | With 100 tons of cement warehouse, built-in dust-proof, spill-proof top device, comprising blowing broken arch, lack of full material alarm. | ||
8 | Screw LSY219-6 | 1 | High-speed screw conveyor to transport cement and fly ash powder scales, using the gimbal ball head, dragon uses no welds integrated process to ensure smooth delivery of cement. | ||
9 | Main stand | 1 | Optional | Steel structure. You can also do simple or not | |
10 | Electronic control system HZS35 | 1 | Optional | Centralized console using centralized control, can achieve inter-linked and semi-automatic production equipment. Major appliances using the brand appliances. | |
11 | Control Room | 1 | Optional | Containing 1 match air conditioning (optional). | |
12 | Gas system | 1 | Including associated gas line and compressor (or user-supplied) | ||
13 | Related Cables | 1 | Related signal cable and electrical cable (or user-supplied) | ||
14 | Total price | Excluding tax, excluding shipping. | |||
15 | Freight | ||||
Remark | 1, Delivery: from the date of signing the contract 10 days of delivery and commissioning. |